Design and construction of a drainage well
Posted: Mon Feb 10, 2025 6:25 am
plastic containers, for example, Eurocubes or other containers of the appropriate volume and composition;
factory-made concrete rings;
pouring a concrete box directly on site;
brickwork laid in a staggered pattern with drainage gaps.
Example of finishing a drainage well with brick
After the material and the design of the device have malta mobile database selected, it is necessary to choose the optimal place for construction and ensure the correct preparation of the pit for deepening or constructing the tank.
In this case, the following rules must be observed.
The distance from the well to the bathhouse itself should be at least 3 meters.
In case of arranging a well with a natural outlet, the distance to the drinking well should be no less than 30 m.
A drainage well, which provides natural filtration, must be located no closer than 2 meters to the boundary of the site.
When calculating the size of the pit, it is necessary to take into account the required volume of the tank, which directly depends on the planned volume of water consumption, and the calculation must be made from the point of the pipeline connection.
The depth of the well should be such that the pipeline inlet is at the level of soil freezing in order to avoid freezing of the system and stagnation in the pipes.
After completing the excavation work to prepare the pit, its bottom and edges must be coated with a clay composition to prevent the edges from crumbling, and a sand cushion and drainage layer must be added if necessary.
Drawing and names of drainage well elements
In this case, it is necessary to take into account:
factory-made concrete rings;
pouring a concrete box directly on site;
brickwork laid in a staggered pattern with drainage gaps.
Example of finishing a drainage well with brick
After the material and the design of the device have malta mobile database selected, it is necessary to choose the optimal place for construction and ensure the correct preparation of the pit for deepening or constructing the tank.
In this case, the following rules must be observed.
The distance from the well to the bathhouse itself should be at least 3 meters.
In case of arranging a well with a natural outlet, the distance to the drinking well should be no less than 30 m.
A drainage well, which provides natural filtration, must be located no closer than 2 meters to the boundary of the site.
When calculating the size of the pit, it is necessary to take into account the required volume of the tank, which directly depends on the planned volume of water consumption, and the calculation must be made from the point of the pipeline connection.
The depth of the well should be such that the pipeline inlet is at the level of soil freezing in order to avoid freezing of the system and stagnation in the pipes.
After completing the excavation work to prepare the pit, its bottom and edges must be coated with a clay composition to prevent the edges from crumbling, and a sand cushion and drainage layer must be added if necessary.
Drawing and names of drainage well elements
In this case, it is necessary to take into account: